Ullersdorf
At the former Weichensdorf munitions depot, which is now a huge forest area, 18 wind turbines with an electrical capacity of 2.4 megawatts each are being installed. The turbines, of type Nordex N117/2400, have a hub height of 141 meters and a rotor diameter of 117 meters. Each year, 115,900 megawatt hours of electricity is fed into the national grid.
Optimization and monitoring by STEAG Energy Services WINDcenter.
Location | Weichensdorf, Brandenburg |
Commissioned | 2014 |
Capacity | 43,2 MW |
Plant | 18 wind turbines of 2.4 MWel each Hub height: 141 meters Rotor diameter: 117 meters |