Project profile
Termopaipa Power Plant
Colombia
The Termopaipa hard coal fired power plant located near the town of Paipa (Colombia) was the first power plant abroad planned, financed and built by STEAG. The plant went into commercial operation on 7 January 1999. With an installed capacity of 165 MW, the power plant even in dry periods reliably supplies electricity to the population and for use in infrastructure and industry.
Commissioned | 1999 |
Installed capacity | 165 MW |
Useful power output | 414 GWh/a |