    At the Quierschied-Weiher site, located about 13 km to the north of Saarbrücken, the capital city of the Saarland state, STEAG operates the Weiher hard coal fired power plant. The plant does not only produce electricity but also district heating.

    Commissioned1918
    Installed capacity724 MW
    Useful power output1.725 GWh/a