• EN
  • Company

    We are STEAG.

    We at STEAG always have been driven by one thing: the will to make ever better use of energy. Today we offer services that cover the entire value chain of a modern energy service provider. We thus ensure not only today's supply, but help to advance the transition to the future of energy. Jointly, safely and efficiently.

    Read more

    Child daycare center run by the Protestant church opens on Horsthof Strasse

    Provision of childcare began on March 1. Daycare center with five groups can accommodate 100 children

    Bottrop/Essen. The new daycare center at Horsthof Strasse 17 in Bottrop is not only impressive from an architectural point of view with its comfortable, light-flooded room concept, but also with cutting-edge heating and air conditioning technology: An eco-friendly system supplies the new daycare center with the necessary heating in winter and efficient cooling in summer.

    The new child daycare center opened its doors on March 1. Stephan Patz, Managing Director of the municipal construction company GBB, is pleased: “With the exception of one door element in the vestibule, we were able to completely finish the interior,” he reports. By the time the weather warms up in May, the outdoor facilities with terraces, sensory trails, playground equipment and Bobby Car race track should all be ready.

    New daycare center significantly improves the availability of childcare in Kirchhellen
    Stefanie Reich, Head of Elementary Education and Schools at Evangelische Kirche Bottrop (Protestant Church of Bottrop) is delighted with the eagerly awaited building, which considerably eases the critical childcare situation in Kirchhellen: “Solely on account of its size, equipment and very tasteful design, our new daycare center on Horsthof Strasse really is something special. Both the children and the team clearly already feel very at home here.” Space is ample, stretching across more than 1,000 square meters and two floors, and there are generously dimensioned storage rooms and even a room accessible from the outside for cleaning and storing sandbox toys – all very practical, but also far from being a matter of course or even standard.

    Designed with children in mind
    Other highlights are the dirt traps, where children coming in from outside can get changed to avoid carrying sand and dirt into the indoor rooms. The building is entirely barrier-free and even has an elevator. A large glass floor enables the natural light entering the spacious hallway area through the skylight in the roof to reach the lower garden level, creating a cheerful atmosphere there too. And what is really special is that the skylight means the children can see right through all the floors to the sky. The floor-to-ceiling window elements in the group rooms also ensure plenty of daylight.

    Sustainable building concept
    he fact that heat protection and sustainability played a special role in the planning of the new daycare center will be evident come the height of the summer. “The green roof will significantly reduce heat influx in the summer and will also enable rainwater to evaporate instead of disappearing down the drain. All the windows can be shaded, and the specially coated glass of the skylight allows much less heat to pass through. This means the building is also well equipped to deal with the more frequent periods of heat that are to be expected in the future,” says developer Stephan Patz.

    Innovative climate technology
    This is also contributed to significantly by the cooperative project of Essen-based STEAG’s energy experts, who planned and designed the heating system and will also operate it. “The air-to-water heat pump uses the thermal energy in the outside air for heating without the use of fossil fuels. It is quiet, economical and environmentally compatible. In addition, the Waterkotte system can also provide cooling in reverse operation, extracting heat from the interior when it is hot and discharging it outside – but not through cold drafts here and there as is the case with air conditioning, but pleasantly and evenly by cooled water flowing through the underfloor heating system,” Monika Klement, Head of Origination at STEAG Fernwärme GmbH, explains.

    Councilor Klaus Müller, responsible for technical matters on behalf of the city of Bottrop, emphatically endorses the use of innovative climate technology: “I am delighted that GBB as a municipal subsidiary is once again leading the way with an innovative and climate-friendly building concept!”

    Scientific support
    The mechanical equipment of the heat pump also includes a large number of sensors and intermediate meters and is monitored remotely by students at the Ruhr West University of Applied Sciences (HRW) in order to be able to evaluate all of the system’s key data at any time and to gain experience with the technology. The new daycare center is therefore also a pilot project, the results of which will help to successfully shape the local energy transition. Prof. Dr. Sylvia Schädlich from HRW has already supervised several such practice-based projects in and around Bottrop: “For students, these practical, science-based and socially relevant projects are an important building block in acquiring skills during their studies. They learn in practice what counts in professional life – and the university's links with companies and institutions in the region are intensified.”

    Project fits in with InnovationCity Bottrop
    “This project fits in perfectly with InnovationCity Bottrop,” says InnovationCity Managing Director Burkhard Drescher with conviction. “Unfortunately, heat pumps are often difficult to implement in existing buildings. Underpinning their huge benefit for climate protection in new buildings is therefore, in my view, very important. That is another step towards accomplishing the energy transition in Bottrop.” Together with all partners involved in the project, Gesellschaft für Bauen und Wohnen Bottrop, Evangelische Kirchengemeinde Bottrop and STEAG wish the daycare center and its children all the very best – may many young Kirchhellen boys and girls spend happy times there.


    Caption: (from left to right): Petra Stehnkamp (seated, KiTa director), Johanna Kaufmann (seated, group leader "Villa Kinder"), Burkhard Drescher, (standing, Gf. InnovationCity), Torsten Sprenger (standing, Hochschule Ruhr West), Prof. Dr.- Ing. Sylvia Schädlich (standing, Hochschule Ruhr West), Nadine Krzykawski (standing, student Hochschule Ruhr West), Stefan Patz (standing, Gf. GBB GmbH), Monika Klement (standing, STEAG Fernwärme), Prof. Dr.-Ing. Ing. Susanne Staude (standing, President of Ruhr West University of Applied Sciences), Klaus Müller (standing, Councillor of the City of Bottrop), Nicole Klinger (sitting in front, Protestant Church of Bottrop) and Stefanie Reich (sitting in front, Protestant Church of Bottrop). In the foreground: the children of the "Villa Gruppe" from the KiTa Horsthofstraße.

    Services

    Energy Services

    Energy Services

    Whether power plants or distributed facilities, whether conventional or renewable energies: we offer tailor-made solutions – from planning and development to implementation and optimization.

    More

    Renewable Energies

    Renewable Energies

    We play an active role in shaping the transition to a sustainable energy mix. We can contribute extensive experience in this field, too, because we already have been relying on renewables worldwide for many years.

    More

    District Heating

    District Heating

    As a regional energy company we supply private households, major customers and real estate companies in North Rhine-Westphalia, Saarland and Poland with environmentally friendly district heating.

    More

    Distributed Energy Supply

    Distributed Energy Supply

    The production of energy at the place it is needed is gaining more and more importance. STEAG New Energies develops tailor-made solutions for industry, municipalities, public utilities and the housing sector.

    More

    Power Plant By-products

    Power Plant By-products

    By-products from hard-coal-fired power plants are valuable building materials for industry. They are used by the concrete industry, for earthworks and road construction, and for horticulture and landscaping applications – and conserve resources there.

    More

    Technical Service

    Technical Service

    STEAG Technischer Service handles the complete planning and implementation of all technical services required for plant operation in the area of maintenance.

    More

    Energy Trading & Optimization

    Energy Trading & Optimization

    Trading & Optimization is the trading unit of STEAG: it handles raw material procurement and trading as well as the control and optimization of assets – for us and for external customers.

    More

    Waste Incineration

    Waste Incineration

    The generation of power and heat based on demanding fuels and sophisticated technologies is our core competence. STEAG Waste to Energy bundles the activities in the area of waste incineration.

    More

    Conventional Power Generation

    Conventional Power Generation

    Our safe and highly efficient power plants stand worldwide for the security of supply that consumers and industry need, now and in future.

    More

    Large Battery Systems

    Large Battery Systems

    Our large-scale battery systems maintain voltage and ensure the reliability of supply despite the increasing fluctuations in the power grid. In future they will take on even more tasks.

    More

    Jobs

    Careers

    STEAG is backed by a solid team.

    Read more
    News

    Child daycare center run by the Protestant church opens on Horsthof Strasse

    Provision of childcare began on March 1. Daycare center with five groups can accommodate 100 children

    Bottrop/Essen. The new daycare center at Horsthof Strasse 17 in Bottrop is not only impressive from an architectural point of view with its comfortable, light-flooded room concept, but also with cutting-edge heating and air conditioning technology: An eco-friendly system supplies the new daycare center with the necessary heating in winter and efficient cooling in summer.

    The new child daycare center opened its doors on March 1. Stephan Patz, Managing Director of the municipal construction company GBB, is pleased: “With the exception of one door element in the vestibule, we were able to completely finish the interior,” he reports. By the time the weather warms up in May, the outdoor facilities with terraces, sensory trails, playground equipment and Bobby Car race track should all be ready.

    New daycare center significantly improves the availability of childcare in Kirchhellen
    Stefanie Reich, Head of Elementary Education and Schools at Evangelische Kirche Bottrop (Protestant Church of Bottrop) is delighted with the eagerly awaited building, which considerably eases the critical childcare situation in Kirchhellen: “Solely on account of its size, equipment and very tasteful design, our new daycare center on Horsthof Strasse really is something special. Both the children and the team clearly already feel very at home here.” Space is ample, stretching across more than 1,000 square meters and two floors, and there are generously dimensioned storage rooms and even a room accessible from the outside for cleaning and storing sandbox toys – all very practical, but also far from being a matter of course or even standard.

    Designed with children in mind
    Other highlights are the dirt traps, where children coming in from outside can get changed to avoid carrying sand and dirt into the indoor rooms. The building is entirely barrier-free and even has an elevator. A large glass floor enables the natural light entering the spacious hallway area through the skylight in the roof to reach the lower garden level, creating a cheerful atmosphere there too. And what is really special is that the skylight means the children can see right through all the floors to the sky. The floor-to-ceiling window elements in the group rooms also ensure plenty of daylight.

    Sustainable building concept
    he fact that heat protection and sustainability played a special role in the planning of the new daycare center will be evident come the height of the summer. “The green roof will significantly reduce heat influx in the summer and will also enable rainwater to evaporate instead of disappearing down the drain. All the windows can be shaded, and the specially coated glass of the skylight allows much less heat to pass through. This means the building is also well equipped to deal with the more frequent periods of heat that are to be expected in the future,” says developer Stephan Patz.

    Innovative climate technology
    This is also contributed to significantly by the cooperative project of Essen-based STEAG’s energy experts, who planned and designed the heating system and will also operate it. “The air-to-water heat pump uses the thermal energy in the outside air for heating without the use of fossil fuels. It is quiet, economical and environmentally compatible. In addition, the Waterkotte system can also provide cooling in reverse operation, extracting heat from the interior when it is hot and discharging it outside – but not through cold drafts here and there as is the case with air conditioning, but pleasantly and evenly by cooled water flowing through the underfloor heating system,” Monika Klement, Head of Origination at STEAG Fernwärme GmbH, explains.

    Councilor Klaus Müller, responsible for technical matters on behalf of the city of Bottrop, emphatically endorses the use of innovative climate technology: “I am delighted that GBB as a municipal subsidiary is once again leading the way with an innovative and climate-friendly building concept!”

    Scientific support
    The mechanical equipment of the heat pump also includes a large number of sensors and intermediate meters and is monitored remotely by students at the Ruhr West University of Applied Sciences (HRW) in order to be able to evaluate all of the system’s key data at any time and to gain experience with the technology. The new daycare center is therefore also a pilot project, the results of which will help to successfully shape the local energy transition. Prof. Dr. Sylvia Schädlich from HRW has already supervised several such practice-based projects in and around Bottrop: “For students, these practical, science-based and socially relevant projects are an important building block in acquiring skills during their studies. They learn in practice what counts in professional life – and the university's links with companies and institutions in the region are intensified.”

    Project fits in with InnovationCity Bottrop
    “This project fits in perfectly with InnovationCity Bottrop,” says InnovationCity Managing Director Burkhard Drescher with conviction. “Unfortunately, heat pumps are often difficult to implement in existing buildings. Underpinning their huge benefit for climate protection in new buildings is therefore, in my view, very important. That is another step towards accomplishing the energy transition in Bottrop.” Together with all partners involved in the project, Gesellschaft für Bauen und Wohnen Bottrop, Evangelische Kirchengemeinde Bottrop and STEAG wish the daycare center and its children all the very best – may many young Kirchhellen boys and girls spend happy times there.


    Caption: (from left to right): Petra Stehnkamp (seated, KiTa director), Johanna Kaufmann (seated, group leader "Villa Kinder"), Burkhard Drescher, (standing, Gf. InnovationCity), Torsten Sprenger (standing, Hochschule Ruhr West), Prof. Dr.- Ing. Sylvia Schädlich (standing, Hochschule Ruhr West), Nadine Krzykawski (standing, student Hochschule Ruhr West), Stefan Patz (standing, Gf. GBB GmbH), Monika Klement (standing, STEAG Fernwärme), Prof. Dr.-Ing. Ing. Susanne Staude (standing, President of Ruhr West University of Applied Sciences), Klaus Müller (standing, Councillor of the City of Bottrop), Nicole Klinger (sitting in front, Protestant Church of Bottrop) and Stefanie Reich (sitting in front, Protestant Church of Bottrop). In the foreground: the children of the "Villa Gruppe" from the KiTa Horsthofstraße.